Uninsulated Warehouse |
|
|
One example from our various hall systems is type TE 600 - TE 1200.
The hall can be varied and supplemented any way to suit your individual needs, for example by integrating domelights or lighting rows into the roof, lateral canopies, craneways etc.
The steel binder distance is 5 m, the slope 6".
|
|
|
Uninsulated warehouse – Type TE 600 – TE 1200
Click to see more pictures.
|
 |  |
| Prices and Additional Information:
|
 |
The following prices are gross list prices, plus VAT valid at that time (prices are valid for Germany).
We would be pleased to work out a detailed offer for your specific needs.
|
|
|
|
 |
Hall type |
 |
|
|
External dimensions W x L x H |
|
Clear height Eaves/ridge
|
|
Area
|
|
Lighting row length
|
|
|
|
|
|
|
 |
TE 600 |
 |
20,36 x 30,36 x 4,78 m |
 |
4,74 / 5,79 m |
 |
600 m²
 |
 |
20 m
 |
 |
79.100 €
 |
 |
| 69.000 € |
 |
12.400 €
|
 |
-
|
|
 |
160.500 € |
TE 600 |
 |
20,36 x 30,36 x 5,78 m |
 |
5,74 / 6,79 m |
 |
600 m²
 |
 |
20 m
 |
 |
86.300 €
 |
 |
| 69.000 € |
 |
12.400 €
|
 |
-
|
|
 |
167.700 € |
TE 600 |
 |
20,36 x 30,36 x 6,78 m |
 |
6,74 / 7,79 m |
 |
600 m²
 |
 |
20 m
 |
 |
93.700 €
 |
 |
| 69.000 € |
 |
12.400 €
|
 |
-
|
|
 |
175.100 € |
 |
TE 800 |
 |
20,36 x 40,36 x 4,78 m |
 |
4,74 / 5,79 m |
 |
800 m²
 |
 |
30 m
 |
 |
95.300 €
 |
 |
| 85.600 € |
 |
13.800 €
|
 |
-
|
|
 |
194.700 € |
TE 800 |
 |
20,36 x 40,36 x 5,78 m |
 |
5,74 / 6,79 m |
 |
800 m²
 |
 |
30 m
 |
 |
104.100 €
 |
 |
| 85.600 € |
 |
13.800 €
|
 |
-
|
|
 |
203.500 € |
TE 800 |
 |
20,36 x 40,36 x 6,78 m |
 |
6,74 / 7,79 m |
 |
800 m²
 |
 |
30 m
 |
 |
113.300 €
 |
 |
| 85.600 € |
 |
13.800 €
|
 |
-
|
|
 |
212.700 € |
 |
TE 1000 |
 |
20,36 x 50,36 x 4,78 m |
 |
4,74 / 5,79 m |
 |
1000 m²
 |
 |
40 m
 |
 |
111.500 €
 |
 |
| 102.000 € |
 |
15.700 €
|
 |
-
|
|
 |
229.200 € |
TE 1000 |
 |
20,36 x 50,36 x 5,78 m |
 |
5,74 / 6,79 m |
 |
1000 m²
 |
 |
40 m
 |
 |
121.900 €
 |
 |
| 102.000 € |
 |
15.700 €
|
 |
-
|
|
 |
239.600 € |
TE 1000 |
 |
20,36 x 50,36 x 6,78 m |
 |
6,74 / 7,79 m |
 |
1000 m²
 |
 |
40 m
 |
 |
132.800 €
 |
 |
| 102.000 € |
 |
15.700 €
|
 |
-
|
|
 |
250.500 € |
 |
TE 1200 |
 |
20,36 x 60,36 x 4,78 m |
 |
4,74 / 5,79 m |
 |
1200 m²
 |
 |
50 m
 |
 |
127.600 €
 |
 |
| 118.800 € |
 |
17.500 €
|
 |
-
|
|
 |
263.900 € |
TE 1200 |
 |
20,36 x 60,36 x 5,78 m |
 |
5,74 / 6,79 m |
 |
1200 m²
 |
 |
50 m
 |
 |
139.600 €
 |
 |
| 118.800 € |
 |
17.500 €
|
 |
-
|
|
 |
275.900 € |
TE 1200 |
 |
20,36 x 60,36 x 6,78 m |
 |
6,74 / 7,79 m |
 |
1200 m²
 |
 |
50 m
 |
 |
152.500 €
 |
 |
| 118.800 € |
 |
17.500 €
|
 |
-
|
|
 |
288.800 € |
 |  |
 | General site plans/view plans/production plans, structural calculations for steel construction and foundation, foundation-/reinforcement-plans, heat insulation proof. The building owner has to bear the costs of the tests.
|
 |  |
 | Steel construction (framework), galvanized, including anchor elements, for a snowload of 75 kg/m².
|
 |  |
 | Roof trapezoidal sheet metal profiles, 0.88 mm strong and Pladur-Z PVDF-coated on the weather side, underside coated with white protecting lacquer.
|
 |  |
 | Roof lighting row 10 m wide, light admitting boards made of Polyester with profile type of the roof trapezoidal sheet metal
|
 |  |
 | Roof draining by galvanized rectangular section eaves gutters and required fall-pipes |
|
|
|
 |  |
 | Wall cladding made of trapezoid steel sheets, 0.88 mm strong and coated on the outside with Pladur-Z, inside coated with white protecting lacquer, without concrete socle h= 0.25 m (see additional services: Earthwork, draining and reinforced concrete works)
|
 |  |
 | Colours of the outside wall sheet metal according to colour choice of the manufacturer, as well as cover lids for the wall sheet metal fastenings without extra cost.
|
 |  |
 | Preforms like hinged caps, front flashing, eaves flashing, gate- and door frames, closing elements etc.
|
 |  |
 | 1 pce. sliding gate 4 x 4 m made of aluminium profile, electric, with safety contact – not including electric installation (see additional services: Electric installation and lighting) – as well as two double-walled steel doors.
|
 |  |
 | Assembly of all before mentioned parts and materials including required additional services |
|
 |
| |
 |
Basis of contract – VOB (contract procedure for building works), present form. Subject to technical changes.
|
|
|
|
|